No. | CLIENT/PROJECT | BRIEF DECRIPTION OF PROJECT | STATUS |
1 |
Internal Security Forces Housing Project, Tabuk Client : Ministry of Interior, K SA Main Contractor: FIAFI Trd. & Cont. Co Consultant : International Associates Consortium of US |
Design, Installation, Testing and Commissioning of HVAC system for 576 villas and 9 public buildings including schools, mosque, market, health club and District cooling chillers. Approximate capacity : 10000 TR |
Completed |
2 |
Royal Commission Housing Compound, Yanbu Client : Royal Commission, Yanbu Main Contractor: DITCO Consultant : Royal Commission |
Design, Installation, Testing and Commissioning of HVAC system based on packaged and split Units for RC villas. Approximate capacity : 1200 TR |
Completed |
3 |
Prince Majid Ibrahim Residential Proiect, Makkah Client : Prince Majid Ibrahim Main Contractor: Amoudi United Co Consultant : Khatib & Almi Co |
Supply, Installation, Testing and Commissioning of HVAC system Based on chillers and AHUs. Total capacity : 540 TR |
Completed |
4 |
Ministry of Finance Head Office Makkah Client : Ministry of Finance, KSA Main Contractor : Fast Contracting Co Consultant: Arabian Consulting Co |
Supply, Installation, Testing and Commissioning of HVAC system Based on chillers, AHUs and FCUs. Capacity : 600 TR |
Completed |
5 |
Jeddah Islamic Port Control Tower Client: Jeddah Islamic Port Main Contractor : Ret Ser Saudi Arabia Consultant: Ret Ser Saudi Arabia |
Supply, Installation, Testing and
Commissioning of HVAC system
Based on chillers & AHUs. Total capacity : 250 TR |
Completed |
6 |
Yousef Bin Ahmed Kanoo Commercial Building, Jeddah Client : Y B A Kanoo Main Contractor: Y B A Kanoo Consultant : Y B A Kanoo |
Design, Installation, Testing and
Commissioning of HVAC system
Based on central split units. Total capacity : 250 TR |
Completed |
7 |
Lexus Center, Jeddah Client : Abdul Latif Jameel Co. Main Contractor: Abdul Latif Jameel Co. Consultant : Zuhair Fayez |
Design, Installation, Testing and
Commissioning of HVAC system
based on packaged units and
DX units. Total capacity : 300 TR |
Completed |
8 |
King Fahad Armed Forces Hospital, Jeddah Client : MODA Main Contractor: Rashid Al Mangour Co Consultant: MODA |
Supply, Installation, Testing and commissioning of HVAC system based on packaged A/c units complete with ducting, grilles And diffusers. | Completed |
9 |
Riyadh Bank, Jeddah Client : Riyadh Bank Main Contractor: Al Muhaidib for Contracting Consultant : Allied Engineering |
Supply, Installation, Testing and commissioning of HVAC system based on packaged and DX A/c Units complete with ducting. | Completed |
10 |
Women's Club, Hafr El Batin Client : MODA Main Contractor: Haif Trading and Cont. Est Consultant : MODA |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
11 |
Conference & Dining of VIP Hafr El Batin Client : MODA Main Contractor: First Saudi Contracting Co Consultant : MODA |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
12 |
Toyota Showroom, Taif Client : Abdul Lateef Jameel Co. Main Contractor: Abdul Lateef Jameel Co. Consultant : Zuhair Fayez |
Supply, Installation, Testing and commissioning of HVAC system complete with packaged & DX Type A/c units and ducting. | Completed |
13 |
Ministry of Finance, Jeddah Client : Ministry of Finance Main Contractor: Al Ahwar Trading Consultant : Saudi Ensas Co Ltd |
Supply , Installation, Testing and commissioning of HVAC system Complete with packaged A/c unit And ducting. | Completed |
14 |
Jet Aviation Terminal Building Jeddah Client : Jet Aviation Main Contractor: Allied Engineering Consultant : Saudi Airlines |
Design, Installation, Testing and
Commissioning of HVAC system Total capacity : 200 TR |
Completed |
15 |
Dar-a-Zikr Al Hakeem School Jeddah Client : Dar-a-Zikr Al Hakeem School Main Contractor : Abdullah Al Ahmary Est Consultant: Masood Architect |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
16 |
Al Emam Center, Jeddah Client : SIIC Main Contractor: SIIC Consultant : Saudi Ensas Co Ltd |
Design, Installation, Testing and
Commissioning of HVAC system Total capacity : 200 TR |
Completed |
17 |
Zahid Tractor Head Office Jeddah Client : Zahid Tractor Main Contractor: Godus Contracting Co Consultant : Godus Contracting Co |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
18 |
Administration Building, SWCC Jeddah Client : SWCC Main contractor : Al Soaib Contracting Co Consultant: SWCC |
Design, Installation, Testing and
commissioning of HVAC system
based on packaged and DX type A/c units complete with ducting. |
Completed |
19 |
Saudia Hanger, Jeddah Client : Saudia Airlines Main Contractor: DITCO Consultant : Saudia Airlines |
Design, Installation, Testing and
Commissioning of ME works. Fabrication & installation of ducts Lighting, power and public Address system. |
Completed |
20 |
Manar Complex, Riyadh Client : Manar Group Main Contractor: Rabiah & Nasser Co Consultant : Saudi Ensas Co Ltd |
Supply, Installation, Testing and Commissioning of HVAC system based on DX type A/c units Complete with ducting. | Completed |
21 |
Air Craft Maint. & SHPG Project Jeddah Client : Saudia Airlines Main Contractor: Development International Trading Co (DITCO) Consultant : Saudia Airlines |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
22 |
Medical Tower, Saudi German Hospital, Jeddah Client : Saudi German Hospital Main Contractor: Saudi German Hospital Consultant: Masood Architect |
Design, Installation, Testing and Commissioning of HVAC system Based on Chillers, AHUs and FCUs. Total capacity : 900 TR | Completed |
23 |
Girls & Boys School, KAAU Madinah Client : King Abdul Aziz University Main Contractor : Arabian Works Company Consultant : King Abdul Aziz University |
Supply, Installation, Testing and Commissioning of HVAC system Based on Package units. Total capacity : 250 TR | Completed |
24 |
GOSI Office Projects Makkah, Tabuk , Jizan, Al Hasa Client : GOSI Main Contractor: Haif Trading & Contracting Co Consultant : Al Nayeem Consultant |
Design, Installation, Testing and Commissioning of HVAC system Based on chillers & AHUs. Approximate capacity – 450 TR | Completed |
25 |
HRH Prince Moh'd Bin Nasser Palace, Riyadh Client: HRH Prince Moh'd Bin Nasser Main Contractor First Saudi Contracting Consultant: Arch Center |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
26 |
Khalaf villas, Riyadh Client: Mr. Mukhbil Khalaf Main contractor First Saudi Contracting Co Consultant: A & O Consultant |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
27 |
HDB - Hemodialysis, Riyadh Client: National Guard Main Contractor: Saad Construction Consultant: Saad Construction |
Design, Installation, Testing and Commissioning of ME works. | Completed |
28 |
Director General of Mineral Resources - HQ Building, Jeddah Client: Ministry of Mineral Resources Main Contractor: DITCO Consultant: Parsons – UK |
Design, Installation, Testing and Commissioning of HVAC system based on chillers, AHUs and Packaged A/c units. Total capacity : 1200 TR | Completed |
29 |
Diabetic Center, Jeddah Client: King Khalid National Guard Hospital Main Contractor: Rashid Al Mangour Co Consultant: Impregilo |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
30 |
92 Villa Project, Riyadh Client: MODA Main contractor: Haif Trading & Contracting Co Consultant: MODA |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
31 |
Al Ahsa Intercontinental Hotel Client: Intercontinental Hotel Main Contractor: Al Mannai Contracting Co Consultant: Moosa Engineering Consulting Co |
Design, Installation, Testing and Commissioning of HVAC system Based on chillers and AHUs. Total capacity : 2400 TR | Completed |
32 |
Al Amaana Office Building Madinah Client: Madinah Municipality Main Contractor: Rio Contracting Consultant: Al Beeha Consultant |
Design, Installation, Testing and Commissioning of HVAC system Based on chillers and AHUs. Total capacity : 2400 TR | Completed |
33 |
TEP-6, Makkah Client: Saudi Telecom Main Contractor: Saudi TKT Consultant: Bugshan |
Design, Installation, Testing and Commissioning of HVAC system Based on chillers and AHUs. Total capacity: 600 TR | Completed |
34 |
Bader Tower, Makkah Client: Isha Tojwari Main Contractor: SCDC Consultant: Dar Ul Makkah |
Design, Installation, Testing and Commissioning of HVAC system Based on central split units. Total capacity : 750 TR | Completed |
35 |
Al Sud Hotel, Makkah Client: Al Sud Hotel Main Contractor: SEDCO Consultant: SEDCO |
Design, Installation, Testing and Commissioning of ME works. HVAC system based on Chillers and AHUs. Total capacity : 1120 TR Fire fighting and plumbing works Public address system Electrical works including LT System, generators, transformers. | Completed |
36 |
Hotel Sofitel - Elaf Kindah Makkah Client: Hotel Sofetal - Elaf Kindah Main Contractor: Saudi Ensas Co Ltd Consultant: SEDCO |
Design, Installation, Testing and Commissioning of ME works. HVAC system based on a chillers and AHUs, Total capacity : 1200 TR Fire fighting and plumbing work. 11 KV switchgear, power transformers, lighting system and LT distribution system. Public Address System. | Completed |
37 |
Hotel Mercury - Elaf Ajyad Makkah Client: Hotel Elaf Ajyad Main Contractor: Satara Consultant: SEDCO |
Design, Installation, Testing and Commissioning of HVAC system Based on Chillers and FCUs. Total Capacity : 450 TR | Completed |
38 |
Samahr Hotel, Makkah Client: Samaher Hotel, Makkah Main Contractor: Al Subeih Consultant: SEDCO |
Design, Installation, Testing and Commissioning of HVAC system Based on Chillers & FCUs. Total Capacity : 550 TR | Completed |
39 |
Indian Embassy School Multipurpose Hall, Riyadh Client: Indian Embassy Main Contractor: Saudi Ensas Co Ltd Consultant: Saudi Ensas Co Ltd |
Design, Installation, Testing and Commissioning of HVAC system Based on packaged A/c units. Total capacity : 200 TR | Completed |
40 |
Namozaj Girls School-2 Riyadh Client: King Saud University Main Contractor: Arabian Works Company Consultant: King Saud University |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
41 |
King Abdul Aziz University Madinah Client: King Abdul Aziz University Main Contractor: Arabian Works Company Consultant: King Abdul Aziz University |
Design, Installation, Testing and Commissioning of HVAC system Based on Packaged A/c units. Total capacity: 210 TR | Completed |
42 |
Riyadh Technical College Riyadh Client: Riyadh Technical College Main Contractor: Al Rashid Trd & Cont. Co Consultant :Zuhair Fayez |
Design, Installation, Testing and Commissioning of HVAC system based on packaged and central Split units. | Completed |
43 |
Patriot Missile Training Center [MODA], Jeddah Client: MODA Main contractor: Al Najdain Est Consultant: MODA |
Design, installation, testing and commissioning of HVAC system based on chillers, packaged units, AHUs and DX units. Total capacity : 500 TR | Completed |
44 |
Women’s Faculty of Science KAAU, Jeddah Client: King Abdul Aziz University Main contractor: Omer K Al Esayi Trad & Cont. Co Consultant: Saud Consultant |
Design, installation, testing and commissioning of HVAC system based on Centrifugal chillers, AHUs & FCUs. Total capacity : 1200 TR | Completed |
45 |
Shumeisy Hotel, Jeddah Client: Dar Al Riyadh Main contractor: Dar Al Riyadh Consultant: Owner |
Design, installation, testing and commissioning of HVAC system Based on DX units. Total capacity : 400 TR | Completed |
46 |
College of Agriculture, Al Hasa Client: Ministry of Education Main contractor: Kholood Trd. Consultant: Ministry of Education |
Design, installation, testing and Commissioning of HVAC system Based on AHUs and FCUs. Total capacity : 1200 TR | Completed |
47 |
King Abdul Aziz International Airport, Jeddah Client: KAIA Main Contractor: Al Mushba Consultant: KAIA Facilities Engineering |
Replacement of coils for AHPs And AHUs. | Completed |
48 |
Petrokemya, Jubail Client: Petrokemya, Jubail Main contractor: Al Zamil Air conditioners Consultant: Saudi Toyo (SATEC) |
Air-conditioning and ventilation of Petrokemya Polyethylene Plant at Jubail with chillers, AHUs and Packaged Units. Approximate capacity: 600 TR | Completed |
49 |
Corniche Gardens, Jeddah Client: Zaki Al Farzi Main Contractor: Al Redwan Consultant: Zaki Al Farzi |
Design, Installation, Testing and Commissioning of ME work for 30 floors twin tower building. HVAC system based on DX units. Total capacity : 6000 TR Fire fighting and plumbing system 11 KV switchgear, power transformers, lighting system and LT distribution system. Public address system. | Completed |
50 |
Food Manufacturing Factory Clint: Food Manufacturing Factory Main Contractor: Azzam Contracting Co Consultant: Jamjoom Consultant |
Design, Installation, Testing and Commissioning of HVAC system based on Chillers & AHUs Approximate capacity : 800 TR | Completed |
51 |
Jeddah Conference Palace Client: Royal Protocol, Jeddah Main contractor: Royal Protocol Consultant: Monther H. Sawan |
Installation, Testing and Commissioning of Plumbing work | Completed |
52 |
Into Plane Fueling - KAIA Client: KAIA, Jeddah Main contractor: Allied Engineering Consultant: Monther H Sawan |
Design, Installation, Testing and Commissioning of HVAC system Based on DX units. Total capacity : 100 TR | Completed |
53 |
Technical Buildings, Shoaiba Power Plant Client: AL STOM Main Contractor: Saudi Archirodon Co (SARCO) Consultant: Saad Consultant |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
54 |
Al Rajhi Towers Jeddah & Makkah Client: Abdul Latif Jameel Co Ltd Main Contractor: Abdul Latif Jameel Co Ltd Consultant: Al Rajih Group |
Design, Installation, Testing and Commissioning of HVAC system Based on chiller and FCUs. Total capacity : 1720 TR | Completed |
55 |
JUPC, Jubail Client: JUPC Main contractor: Al Zamil Air conditioners Consultant: Saudi Toyo (SATEC) |
Design, Installation, Testing and Commissioning of HVAC system based on packaged and DX units | Completed |
56 |
Tamkeen Factory, Jeddah Client: Tamkeen Factory Main contractor: Tamkeen Factory Consultant: Mr. Othman |
Design, Installation, Testing and Commissioning of ME works HVAC system based on Packaged & split A/c units. Total capacity : 150 TR Plumbing & fire fighting system Security & fire alarm system. Telephone system. Power & lighting system. Switchgear, power transformers, And LT distribution system. | Completed |
57 |
NBCC Factory, Jeddah Client: NBCC Main contractor: NBCC Consultant: NBCC |
Installation, Testing and Commissioning of HVAC system complete with packaged units And related ducting & grilles. Total capacity : 175 TR | Completed |
58 |
Batterjee Factory for Medicine Jeddah Client: Batterjee Group Main contractor: Batterjee Group Consultant: PKID, India |
Design, Installation, Testing and Commissioning of ME works. HVAC system based on Carrier make chiller and 16# AHUs For clean room Application with BMS system. Fire fighting and plumbing system. Switchgear, power transformers, lighting system and LT distribution System. | Completed |
59 |
Sure Beam, Riyadh Client: Sure Beam Main contractor: First Saudi Consultant: Saudi Ensas Co Ltd |
Design, Installation, Testing and Commissioning of HVAC system based on chiller for industrial application (E beam Machine) Total capacity : 200 TR | Completed |
60 |
SAFCO-IV Jubail Client: SABIC Main contractor: Al Zami Airconditioners Consultant: SABIC |
Design, Installation, Testing and Commissioning of HVAC system based on Packaged & DX type A/c units complete with necessary ducting, grilles and Diffusers. | Completed |
61 |
Al Waha Juice Factory Riyadh Client: Al Waha Juice Factory Main contractor: United Saudi Co Consultant: SAK Engg. Consultant |
Design, Installation, Testing and Commissioning of HVAC & Electrical System. HVAC system based on chillers (200 TR). Fire fighting and plumbing system. 11 KV switchgear, power transformers, lighting system and LT distribution system. | Completed |
62 |
SABG - Girls Elementary School Dammam Client: Saudi Aramco Main Contractor: Al Mohaidib Consultant: Saudi Aramco |
Installation, Testing and Commissioning of HVAC units including chillers, AHUs & FCUs c/w underground pre-insulated Piping and necessary ducting. | Completed |
63 |
Business Oasis Center Client :Supreme Commission for Tourism Main Contractor: Al Sariff Contracting Consultant: Saad Consultant |
Design, Installation, Testing and Commissioning of HVAC system based on screw chillers and AHUs. Total capacity : 2400 TR Fire fighting and plumbing system | Completed |
64 |
KFSH - Genetic Laboratory Riyadh Client: King Faisal Hospital Main contractor: First Saudi Consultant: KFSH & RC |
Installation, Testing and Commissioning of HVAC units including AHUs complete with chilled water piping and Ducting. | Completed |
65 |
Riyadh Refinery Riyadh Client: Saudi ARAMCO Main contractor: Al Suwaidi Industrial Co Consultant: ARAMCO |
Design, Installation, Testing and Commissioning of HVAC system Based on central split units. | Completed |
66 |
AL WAHA PDH Project Jubail Client: SAHARA AL WAHA Main contractor: Al Zami Airconditioners Consultant: Technimount |
Design, Installation, Testing and Commissioning of HVAC system based on Chiller, AHUs and Packaged Units. Approximate capacity : 450 TR Chilled water piping, ducting And grilles/diffusers. | Completed |
67 |
Dar Al Hekhma College Jeddah Client: Dar Al Hekhma College Main Contractor: Fast Contracting Consultant: Zuhair Fayez |
Design, Installation, Testing and Commissioning of HVAC system Based on Packaged A/c units. Total Capacity : 120 TR | Completed |
68 |
3 Schools - Yanbu Client: Royal Commission, Yanbu Main Contractor: Fast Contracting Consultant: Royal Commission |
Design, Installation, Testing and Commissioning of HVAC system Based on Packaged A/c units. Total capacity : 900 TR | Completed |
69 |
4 Schools - Yanbu Client: Royal Commission, Yanbu Main Contractor: Al Saad Trading & Cont. Co Consultant: Royal Commission Consultant: King Saud University |
Design, Installation, Testing and Commissioning of ME works. HVAC system based on Packaged A/c Units. Total capacity : 1150 TR Fire fighting and plumbing system. 11 KV switchgear, power transformers, lighting system and LT distribution system. Public Address System. Fire Alarm System | Completed |
70 |
Girls College, Qassim Client: Girls College Presidency Main Contractor: Al Fouzan Consultant: Girls College Presidency |
Design, Installation, Testing and Commissioning of HVAC system Based on FCUs. Total capacity : 1500 TR | Completed |
71 |
College of Medicine & Pharmacy Al Ahsa Client : King Faisal University Main Contractor: Fast Contracting Consultant: Al Naeem |
Design, Installation, Testing and Commissioning of HVAC system based on Chiller (4#) and AHUs (16#). Total capacity : 1360 TR | Completed |
72 |
Al Saif Villa, Riyadh Client: HRH Prince Sattan Main contractor: First Saudi Contracting Co Consultant: Saudi Ensas |
Design, Installation, Testing and Commissioning of HVAC works based on packaged units c/w VVT system, ducting, grilles / Diffusers. Total capacity : 75 TR | Completed |
73 |
Aba Al Khail Villa, Riyadh Client: Shaikh Issam Main contractor: First Saudi Contracting Co Consultant: Saudi Ensas |
Design, Installation, Testing and Commissioning of HVAC system based on packaged units c/w VVT system, ducting, grilles/ Diffusers. Total capacity : 100 TR | Completed |
74 |
NATPET Project Yanbu Client: NATPET Main contractor: Technimount/Al Zamil Consultant: Technimount |
Installation, Testing and Commissioning of Electrical Works. Power & control cabling and Termination for HVAC equipment. control devices installation and Termination. Installation of DDC and MCC panels with termination | Completed |
75 |
YANSAB Yanbu Client: YANSAB Main contractor: Cinopec/Al Zami Ac Consultant: Cinopec |
Installation, Testing and Commissioning of Electrical Works. Power & control cabling and Termination for HVAC equipment. control devices installation and Termination. Installation of DDC and MCC panels with termination | Completed |
76 |
ARAMCO NGL PLANT Yanbu Client: ARAMCO Main contractor: Al Suwaidi Industrial Co Consultant: ARAMCO |
Supply, Installation, Testing and Commissioning of HVAC system for Substations based on Zamil make Packaged A/c units and DX Units. Approximate capacity : 150 TR | Completed |
77 |
Basmah Compound, Jeddah Client: Shaikh Basmah Main contractor: Rawasi Architects & Cons. Engg. Consultant: Rawasi Architects & Cons. Engg. |
Design, Installation, Testing and Commissioning of ME works for 3 villas & Annex buildings. HVAC system based on Packaged & DX units. Total capacity : 350 TR Plumbing & fire fighting system. Security, CCTV & MATV system Lighting & fire alarm system LT distribution system. | Completed |
78 |
Maaden Office Building Riyadh Client: Maaden Main Contractor: First Saudi Contracting Co Consultant: Saudi Architect |
Design, Installation, Testing and Commissioning of HVAC system based on following A/c equipment Chillers - 948 TR 165# FCUs - 820 TR 3# chilled water pumps. | Completed |
79 |
Intercontinental Hotel Extension, Al-Khobar Main Contractor: First Saudi Contracting Co. Consultant: SKP Lebanon |
Design, Installation, Testing and Commissioning of HVAC system Based on following A/C equipment chiller – 600TR AHUs # 13 FCUs # 100 Chilled Water Pump # 8 | Completed |
80 |
Udhaliya Aramco, Al-Hasa Main Contractor: Al Suwaidi Indust. Co Jubail Consultant: Saudi Aramco |
Design, Installation, Testing and Commissioning of HVAC system Based on following A/C equipment Chiller – 65TR | Completed |
81 |
B 13, Taibah University, Madinah Main Contractor: Abdullah A.M. Al Khodari Sons. Co Consultant: Saud Consultant - Riyadh |
Design, Installation, Testing and Commissioning of HVAC system Based on following A/C equipment AHU’s # 24 (50 TR Each) FCU’s # 18 Split Units # 16 Pumps # 5 | Completed |
82 |
Computer Research Building and Car Parking (KACST) - Riyadh Main Contractor: First Saudi Contracting Co. Consultant: KACST/Al Zaid Engineering Consultant Riyadh |
Design, Installation, Testing and Commissioning of HVAC system Chiller # 4 (350 TR each) AHU 20Nos | Completed |
83 |
Administration Building Dammam University Main Contractor: Azmeel Contracting Co. Consultant: Saud Consultant-Dammam. |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
84 |
Student Housing (A2 & B2) KFU-Dammam Main Contractor: Azmeel Contracting Co. Consultant: Saud Consultant -Dammam |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
85 |
Recreation Building & Student Housing, KFU-Dammam Main Contractor: Azmeel Contracting Co. Consultant: Saud Consultant –Dammam |
Design, Installation, Testing and Commissioning of HVAC system | Completed |
86 |
Moosa Tower Jeddah Main Contractor: SAME Contracting Co. Consultant: Masakin -Jeddaj |
Supply, Installation, Testing and Commissioning of HVAC system | Completed |
87 |
C – 16 Housing, Jubail Main Contractor: Azmeel Contracting Co. Consultant: Royal Commission |
Supply, Installation, Testing and Commissioning of HVAC system | Completed |
88 |
AKH Tower, Al Khobar Main Contractor: Shapoorji Pallonji. Consultant: Dewan Consultants |
Supply, Installation, Testing and Commissioning of HVAC system Water cooled Centrifugal Cjhillers | Completed |
89 |
Hadeed Jubail Main Contractor: AG&P Co. Consultant: Hadeed |
Supply, Installation, Testing and Commissioning of HVAC system | Completed |
90 |
Al Marai Factory, AI Kharj Client : Al Marai Co. Consultant : Saud Consultant - Riyadh |
Design, Installation, Testing and Commissioning of HVAC system at below facilities in the Al Kharj Facility of client: 1- 40 MVA substation PACU#02 2- Culture freeze and water polish AHU#02 3- 40MW power station PACU#02 4- Substation # 32 PACU#02 5- B9A consolidated warehouse Chiller 80TR-01, AHU#1, FCU#22 6- T&L Canteen Building Chiller 75TR-1, FAHU#1, FCU#24 7- Fat melting heating drum PACU#3, FAN#3 8- Cane Filling Facility PACU#3 |
Completed |
91 |
Sewage Pump Station KAA Airport, Jeddah Client : GACA Main Contractor : Orascom Consultant : DAR |
Installation of Air Conditioning and Ventilation System | Completed |
92 |
HVAC Upgradation – Abeer Medical Group Client : Abeer Medical Group Main Contractor : Arabian Leopard Consultant : Abeer Medical Group |
03 Operation Theatre (OTs) upgradation with HEPA filters Sterile Areas HVAC Work HVAC Work in General Area and Lab PACU-03, FAN-03 |
Completed |
93 |
Gurkan Riyadh Client : Inma Aghdiya Co. Consultant : Gurkan Riyadh |
Design, Installation, Testing and Commissioning of Dx Cooling System for Riyadh Restaurant with Fresh Air Cooling. PACU-1, AHU-2, FCU-12 |
Completed |
94 |
IDB Data Center Standby System Client : IDB Consultant : IDB |
Design, Installation, Testing and Commissioning of Standby System for Data Center with chilled water connected to Genset. CHILLER-125 TR 1 No. PUMPS-2 Nos CRAC – 1 No. |
Completed |
95 |
NFIC Multiple Upgradation Project Client : NFIC Consultant : NFIC |
Design, Installation, Testing and Commissioning of various Process related Piping, Insulation and Cladding. Design and Installation of HVAC for common areas, R.O Plant rooms and server room. |
Completed |